NC Refrigeration License: Classes, Exam and Fees
Last verified: November 11, 2026
This guide is for a technician or shop owner who wants to contract for commercial, industrial, service or transport refrigeration work in North Carolina under their own name. The license is held by a person, not by the LLC, and it comes from its own board, the State Board of Refrigeration Contractors. If your work is heating and comfort cooling only, that is a different board; start with our HVAC business guide.
Who Needs a Refrigeration License and Who Does Not
The statute says anyone, resident or not, must apply to the Board and get a license before engaging in the refrigeration business or contracting. Doing the work or offering to do it without one is a Class 3 misdemeanor (G.S. 87-57; G.S. 87-61). Employees working under the supervision of a licensed firm are not treated as contracting themselves, so a technician who works for a licensed shop does not need a contractor license (G.S. 87-61).
The article does not apply to the following, so check this list before you pay for an exam (G.S. 87-58(a1)):
- Installing self-contained commercial units that have a factory molded plug and do not require opening the service valves
- Installing or servicing household self-contained appliances with a factory molded plug that are connected to a permanently installed receptacle and do not require opening the service valves
- A business, or its employees, that installs, maintains and services its own refrigeration equipment without contracting for others, such as a grocery chain's in-house maintenance crew
- Selling, repairing and installing comfort cooling devices or systems
- Replacing lamps, fuses and door gaskets
The comfort cooling exclusion is where the two trades meet. Walk-in coolers, ice machines, display cases, cold storage and trailer units are refrigeration. Air conditioning for people is not, and it falls under the heating groups on our HVAC license page. A shop that does both needs to hold both licenses.
What You Need Before You Start
- 4,000 hours of refrigeration experience: The hours must relate to the class you want, and up to half may be technical training in the field (21 NCAC 60 .0207).
- A supervisor's statement: The application asks for a record of your experience and education and a statement from your supervisor or supervisors verifying it.
- Your Social Security number: The application requires it, along with your contact information, the business name you will operate under if any, and whether you have been disciplined by another licensing board or agency.
- The $100 exam application fee: It is nonrefundable and is paid with the application (21 NCAC 60 .0209).
Get the current application form from the State Board of Refrigeration Contractors website or from the Board office. Our server cannot open the Board's site, so everything below comes from the General Statutes and the Board's rules, and the Board's own pages may carry newer details.
Step 1: Pick the Right Class
North Carolina issues four refrigeration contractor classes, defined by the work you do rather than by the size of the job (G.S. 87-58(a) and (b)):
| Class | Required for | Who it fits |
|---|---|---|
| Class I | Commercial refrigeration contracting: installing, maintaining, servicing and repairing refrigerating machinery, equipment and related components | Shops that install and service supermarket, restaurant and cold storage systems |
| Class II | Industrial refrigeration contracting: commercial refrigeration contracting using ammonia as the refrigerant | Contractors working on ammonia plants, such as processing and cold storage facilities |
| Class III | Refrigeration service contracting: maintenance, servicing and repair only | Service companies that do not install |
| Class IV | Transport refrigeration contracting: installing, maintaining, repairing and servicing transport refrigeration | Reefer truck and trailer unit shops |
Our reading: a service-only company should start with Class III or IV, because the Board lets a holder of a valid transport or service license sit the commercial exam later on a new application (21 NCAC 60 .0207(c)). That is reasoning from the rule, not Board advice. You can hold more than one class if you meet the qualifications and pass each exam (21 NCAC 60 .0207(d)).
Step 2: Document Your 4,000 Hours
The Board counts hours of refrigeration experience relevant to the class you chose, completed before you file. Gather pay records, employer letters and any trade school or manufacturer training you want counted toward the technical half. If you fail an exam, the Board keeps the verification of experience on file and it stays sufficient for later attempts as long as you file a new application with the fee (21 NCAC 60 .0213(h)).
The rules we read do not say who may sign the supervisor statement or what documents prove the hours. Ask the Board before you collect letters from employers who have closed.
Step 3: Apply and Pass the Exam
File the Board's application with the $100 fee. The Board then tells you the date, time and place of the exam (21 NCAC 60 .0213). The statute describes the exam as testing analysis of plans and specifications, estimating cost, and the fundamentals of installation and design as they apply to refrigeration (G.S. 87-58(d)).
- Format: The commercial and industrial exams have four parts. The service and transport exams have three. Exams are written or computer based.
- Passing score: At least 70 percent on each part.
- Time limits: You must pass every part within one year and within three consecutive attempts, or your passing grades for individual parts lapse and you retake all parts.
- If you fail: Wait five business days from the date you last failed before taking another exam, and retake only the parts you have not passed.
- No-shows: A missed exam counts as an attempt unless you give notice five business days ahead.
Once you pass, the Board issues a certificate with your license number. The license cannot be assigned or transferred to another person (21 NCAC 60 .0207(b)). A contractor already licensed in another state can ask the Board for a reciprocal license, which the statute allows only to the extent the other state grants reciprocity to North Carolina licensees (G.S. 87-58(j)). Military-trained applicants and military spouses have their own route under 21 NCAC 60 .0214.
Step 4: Put the License to Work
- Post it and print the number: Post the current license where you do business. The number must appear on all proposals and contracts and on requests for municipal permits (G.S. 87-58(g)).
- Pull the permit first: Before you start installation work, get the permit from the local building code enforcement official and request the final inspection within 10 days of finishing, unless you and the owner and the inspector agree otherwise (21 NCAC 60 .0311(b)). Which city or county office issues it depends on where the job sits.
- Supervise the work you pull permits for: The rule limits your permits to work you hold the contract for, supervise in person while it is in progress, and are paid for (21 NCAC 60 .0311(c)).
- Use the exact licensed name: Business, advertising and filed documents must use the exact name on the license, and a trade name change needs the Board's approval (21 NCAC 60 .0312 and .0314(b)).
- Report moves: Tell the Board in writing within 30 days of a change of address or business location (21 NCAC 60 .0316).
A corporation or partnership can contract if at least one connected person holds the license, signs the contracts, supervises the work and answers for compliance with the Article. The connection must be a written contract signed before the company starts refrigeration contracting (G.S. 87-62). Forming an LLC does not make it licensed, and if your licensee leaves the company, the Board decides on what conditions work already begun may be finished, and no new work may be bid until the company is licensed again (21 NCAC 60 .0314(c)).
Step 5: Form Your Business and Register
If you will contract through a company, form it after you know who the qualifying license holder is. Our LLC guide covers the Secretary of State filing, and our LLC formation comparison sets filing it yourself next to using one of our two partners. Then:
- Get an EIN if you need one. The IRS issues it free (IRS: get an EIN; see our EIN guide).
- Register with the Department of Revenue for sales and use tax (NCDOR: sales and use tax registration). How tax applies to a job that bundles equipment and labor is a question for NCDOR.
- Carry workers' compensation once you regularly employ three or more people in the business (N.C. Industrial Commission: employers; G.S. 97-2).
Insurance and bonding: the refrigeration article (G.S. 87-52 to 87-64) and the Chapter 60 rules we read do not state a liability insurance or bond requirement for the license. A customer, a landlord or a local permit office may still ask for proof, so confirm with the Board and your permit office before you bid. Our business insurance guide covers the coverage types.
Step 6: Renew Every Year
The license renews annually. The Board mails renewal applications on or about October 31, and the renewal fee is due by January 1 (G.S. 87-64(b); 21 NCAC 60 .0304). Failing to renew automatically forfeits the right to engage in the refrigeration business, and a license that lapses for two consecutive years requires you to pass the exam again (G.S. 87-64(c)).
| Item | Cost | Source |
|---|---|---|
| Exam application (nonrefundable) | $100, the statutory ceiling | 21 NCAC 60 .0209(1); G.S. 87-64(a) |
| Annual license renewal | $80, the statutory ceiling | 21 NCAC 60 .0209(2); G.S. 87-64(b) |
| Reinstatement of a lapsed license | $120; the statute allows up to $160 | 21 NCAC 60 .0209(3); G.S. 87-64(c) |
These are the Board's fees as set in its rule, which in each case the statute caps. The rule lists no separate first-year license fee, while the statute says the exam application is accompanied by the annual license fee, so ask the Board what you owe after you pass. The statute also lets the Board require continuing education for renewal (G.S. 87-64(b)); the Chapter 60 rules we read set no continuing education requirement, so confirm with the Board whether any applies to your renewal.
EPA Refrigerant Certification Is Separate
A Board rule requires licensed refrigeration contractors and technicians who handle refrigerants to hold certification from an EPA-approved technician certification program (21 NCAC 60 .0211). The federal rule behind it requires anyone who could reasonably breach a refrigerant circuit while maintaining, servicing, repairing or disposing of covered appliances to pass an approved certification exam, with Type I for small appliances, Type II for high-pressure systems, Type III for low-pressure systems and Universal for all three (40 CFR 82.161). The list of application items in 21 NCAC 60 .0207 does not include an EPA certificate, so an EPA card is not a stated condition for sitting the exam, but handling refrigerants on the job requires it.
Tips and Common Mistakes to Avoid
- Bidding past your class. A Class III license covers service and repair. An install job needs Class I, and an ammonia system needs Class II.
- Letting the renewal slide. The fee is due by January 1, and two missed years means a new exam.
- Treating the LLC as the license. The license belongs to a person, and the company works under it only through the written connection in G.S. 87-62.
- Assuming a comfort cooling license carries over. The heating groups on the HVAC side and the refrigeration classes are separate licenses from separate boards.
- Using the wrong name. Contracts, ads and permit applications must carry the exact name and number on the license.
- Counting hours you cannot document. The 4,000 hours need a supervisor's statement, and a closed employer is the usual gap.
Where This Guide Stops
This guide does not cover plumbing, electrical or heating licenses, building codes for the equipment, or fees and forms that exist only on the Board's website. We read the General Statutes on ncleg.gov, the Board's rules as published by the Office of Administrative Hearings and on Cornell's Legal Information Institute, and the federal rule on Cornell, all on November 11, 2026, and could not open the Board's own site to compare.
Next Steps
Add up your documented hours against the 4,000-hour rule, choose the class that matches the work you will bid, and call the Board to confirm the application form, the first-year fee and whether continuing education applies. Once you know who will hold the license, form the company, register with the Department of Revenue and arrange workers' compensation before you hire. For the license that sits next to this one, read our general contractor license guide.
Sources
- N.C. General Statutes, Chapter 87, Article 5 (Refrigeration Contractors), read November 11, 2026: 87-57, 87-58, 87-61, 87-62, 87-64
- North Carolina Administrative Code, Title 21, Chapter 60 (Board of Refrigeration Contractors), read November 11, 2026: chapter index on Cornell LII, .0207, .0209, and the Office of Administrative Hearings rule text for .0211, .0213, .0214, .0304, .0311, .0312, .0314 and .0316
- N.C. State Board of Refrigeration Contractors (named in 21 NCAC 60 .0102; not readable from our server)
- 40 CFR 82.161, technician certification (Cornell LII)
- IRS: get an EIN; N.C. Department of Revenue: sales and use tax registration; N.C. Industrial Commission: employers
Important Disclaimer
This article is informational and not legal advice. Refrigeration licensing rules, fees and forms change and depend on your facts. Confirm your class, fees and application steps with the State Board of Refrigeration Contractors, and ask your city or county building code office what permits your jobs need.
Keep exploring: related North Carolina guides
- North Carolina Locksmith License
- Handyman License in North Carolina
- NC HVAC License
- NC Plumbing License
- NC General Contractor License
- Apply for LLC in NC
- North Carolina Business License
- How Much Does It Cost to Start a Business in North Carolina
- All North Carolina business types
- Every North Carolina guide in one place